| Completion date |
Tasks |
| September - weeks one and two
(September 3 - September 9) |
|
DONE
|
Daniel
| : |
Send database contents with explanation to Lockheed-Martin
|
|
DONE
|
Ron
| : |
Snap-to roads (i.e., map a point to the closest point on the closest road)
|
|
DONE
|
Shankar and Jiang
| : |
Research differential GPS, determine accuracy of our GPS units, and select
error-correction method for demo
|
|
DONE
|
Bob
| : |
Playback mode for audience map
|
|
DONE
|
Bob
| : |
Integration: phase one: Add gateway to SORD, make SORD use correct network device,
allow one agent to query multiple Smart databases, retrieve complete
document text from Smart databases, write out document text for clustering
software, use bitmaps for objects on audience map, test Metricom radio modems,
test clustering software, integrate GPS into soldier's GUI, enhance the
agent_jump timeout (in D'Agents core), and develop installation procedures
|
|
| September - week three
(September 17 - September 23) |
|
DONE
|
Everyone
| : |
Return Gateway laptops to Bob
|
|
DONE
|
George, Daniela and Dave
| : |
Find volunteers to run the laptops during the demo
|
|
DONE
|
Lockheed
| : |
Suggest "interesting" queries
|
|
DONE
|
AlphaTech
| : |
Comment on audience and soldier GUI's
|
|
DONE
|
Bob
| : |
Extend Alex's SQL agent to allow queries that involve multiple database fields
|
|
DONE
|
Robert
| : |
Integrate SQL query GUI into main soldier GUI
|
|
DONE
|
Shankar and Jiang
| : |
Implement GPS error-correction scheme
|
|
DONE
|
Alex Iliev
| : |
Finish tracker
|
|
DONE
|
Bob
| : |
Integration: phase two
| DONE | Add buildings to audience map
|
| DONE | "Gray out" tracks on GUI if laptop out of contact
|
| DONE | Integrate Ron's snap-to roads,
|
| DONE | Make hypothesis tracker load the map
correctly
|
| DONE | Make hypothesis tracker read the
message times correctly
|
| DONE | Test hypothesis tracker
|
| DONE | Add timeout to Mike's wireless_jump
|
| DONE | Switch all jumps to Mike's wireless_jump
|
| DONE | Make Mike's wireless_jump handle agents that go
to and from the wired network (i.e., jump to the gateway machine
if you are trying to cross the boundary)
|
| DONE | Add hypothesized tracks to audience map
|
| DONE | Integrate GPS error correction
|
|
|
DONE
|
Daniel and Bob
| : |
Determine range of Metricom's (in the Hanover environment) and choose
positions for the vehicle observers
|
|
| September - week four
(September 24 - September 30) |
|
DONE
|
Alex Iliev
| : |
Add playback mode to tracker (e.g., write events to persistent store on
one run, and then playback at real-time speed on a later run)
|
|
DONE
|
Dave
| : |
Get walkie-talkies
|
|
DONE
|
George
| : |
Call campus security and Hanover police and explain demo to them
|
|
DONE
|
Bob
| : |
Test SORD over RoamAbouts
|
|
DONE
|
Bob
| : |
Test SORD over Metricoms
|
|
DONE
|
Bob
| : |
Install necessary software on arrest-team laptops
|
|
DONE
|
Bob
| : |
Install necessary software on observer laptops
|
|
DONE
|
Bob, Daniel, Robert, Brian and Hiro
| : |
Test vehicle-observation phase
|
|
DONE
|
Bob, Daniel, Robert, Brian and Hiro
| : |
Test arrest-team phase
|
|
DONE
|
Bob
| : |
GUI enhancements based on AlphaTech feedback
|
|
DONE
|
Everyone
| : |
Final list of queries
|
|
| October - week one
(October 1 - October 7) |
|
DONE
|
Bob, Daniela, George and David
| : |
Start demo presentation
|
|
DONE
|
Alex and Bob
| : |
Add tracking code to "interesting" agents
|
|
DONE
|
Everyone
| : |
Dry run one: Vehicle-observation phase
|
|
DONE
|
Everyone
| : |
Dry run one: Arrest-team phase
|
|
DONE
|
Bob
| : |
Fixes: first round: Less aggressive "graying out" of out-of-contact laptops;
single script that starts everything; memory leak in router agent;
more extensive testing of GPS error-correction subsystem
|
|
| October - week two
(October 8 - October 14) |
|
MISSED (RAIN)
|
Everyone
| : |
Dry run two: vehicle-observation phase
|
|
MISSED (RAIN)
|
Everyone
| : |
Dry run two: arrest-team phase
|
|
|
Bob
| : |
Add one "complex" query from the final query list
|
|
|
Bob, Daniela, George and David
| : |
Finish demo presentation
|
|
DONE
|
Everyone
| : |
Real run one: all phases (and videotape?)
|
|
| October - week three
(October 15 - October 18) |
|
DONE
|
Everyone
| : |
Real run two: all phases with presentation (and videotape again?)
|
|
| October - week four
(October 19-20) |
|
|
Everyone
| : |
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
|
|
| October - week five
(October 21) |
|
|
Everyone
| : |
Drinks on Bob
|
|
|
Bob
| : |
Vacation
|
|